Customer bills will increase effective with usage starting on Feb. 1, 2022 and as authorized by the Maryland Public Service Commission will be partially reduced by certain tax benefits. With the rate adjustment and offsets approved by the PSC, the average residential electric bill will increase by $3.28 per month and the average residential natural gas bill will increase by $2.40 per month. See bge.com/myp for details.
If I am adding additional natural gas appliances to my home, will the existing gas service equipment meet increased demand?
Visit our Construction & Remodeling section to request to install new gas/electric service, increase your electric service, or relocate your gas/electric service.
What happens after I submit the service application and the load information sheet(s)?
Your job will be assigned to a BGE Representative who will contact you about your project. You may have to supply additional information to ensure we are able to provide you with a standard level of service. A standard level of service includes:
The BGE representative will provide you with a Service Request and/or Work Order number. The Work Order number is our primary mechanism for tracking the status of your project. Please refer to this number when making inquiries.
How much notice does BGE need to install an underground gas or electric service to my new house?
The entire process, which includes initiation, design, site readiness and construction, can take between 4 and 12 weeks, depending on the scope of work, permitting requirements and weather conditions. For this reason, it is important to contact BGE by submitting a Service Application as early as possible in your planning process (e.g., permitting stage).
How do I upgrade or relocate my existing service?
Electric First, contact a licensed electrician. It will be necessary for your electrician to obtain an electrical permit for wiring changes to your equipment. Second, submit a Service Application to BGE with a drawing reflecting the new gas/electric location for the relocated service. Third, ensure your electrician contacts us to set up an appropriate order for changing your existing service. After your electrician has completed wiring changes, he will contact the electrical inspection department of your local jurisdiction for an inspection. When that inspection has been approved, the local jurisdictional inspection department will send us certification, which ensures your wiring meets code. Once we receive certification, BGE can complete your wiring connection at the meter. For safety precautions, we will require access to your panel box. Gas The same scenario applies when increasing/upgrading your gas service. Your first call would be to a licensed plumber who will obtain a permit with the plumbing inspection department.
Does BGE install underground telephone, outdoor lighting, and cable TV with their utilities?
Yes, we often do. BGE has agreements with many of these service providers. Just note your interest on your service application.
If I am developing a new townhouse community, what consideration should I give to BGE for service and metering?
You will need to pay close attention to BGE's Conditions of Supply and Location of Gas and Electric Meters, referenced in the BGE Metering Manual. These areas detail what responsibilities you have in allowing adequate room for our gas and electric equipment. A BGE representative will work closely with you to ensure that the area dedicated to BGE metering is clearly agreed upon by you and BGE. Please provide BGE with any architectural drawings that you may have as early as possible. Final design drawing must be signed and returned to BGE before work will begin.
What information is required to request service?
Full address (street number and name) of project location Company legal name (if applicable) Contact information Phone number(s) where the contact(s) can be reached Name of development and lot number (developers only) Type of service requested (gas, electric, new, relocation, temporary) Target completion date for service Copy of your site plans (minimum scale of 1' = 100')
How soon will BGE contact me?
A BGE representative will call you within approximately 10 days after we receive your service application.
What happens if the site is not ready for construction?